Park Electric CooperativePart of our Co-op
Customer ServiceEnergyCommunity and NewsCooperativeContactSearch

Electrical Projects

Woman construction manager

If you are new to the cooperative and require installation of a service or are already a member and want to change or add to an existing service, there are several steps you must complete prior to being put on the construction schedule. Following are the steps required to help keep you on track. The sooner we receive all the necessary documents, permits and fees the sooner you can expect to have your service scheduled for installation.

Project Steps

Each of the following steps must be completed before your service can be scheduled for installation:

  1. Electrical permit received by Park Electric
  2. Easement(s) signed & notarized
  3. Contract signed & notarized  (if applicable)
  4. Aid of construction and associated fees paid

Once all fees and documents are received by Park Electric, your project will be placed on the schedule. Generally, once on the schedule, it takes two weeks to begin the project.

Park Electric Cooperative, Inc. © All Rights Reserved
P.O. Box 1119 / 5706 U.S. Hwy 89 South / Livingston, MT 59047-1119 USA
406.222.3100 / info@parkelectric.coop
Site Developed in part by Basin Electric Power Cooperative